IRIS4 La Marzocco智能套件 S3 Remote · C3 Dosing Chip

IRIS4 GUIDE

Post-Installation Handover Checklist: First Shot to Support Records

A practical handover checklist for Wi-Fi, cloud binding, C3, Bluetooth scale, real extraction, backflush, OTA state, and support records.

After installation, a bright screen is not enough. A good handover checks the network, cloud, C3, Bluetooth scale, a real extraction, and support records. This makes it much faster to locate the cause of later disconnections, weight differences, or update problems.

1. Basic Acceptance Checks

ItemPass Condition
Boot and touchLanguage selection, swipes, half-screen taps, PWR, and BOOT respond correctly.
Wi-Fi2.4GHz Wi-Fi can be saved and the LAN IP appears on the settings page.
Admin portalLanguage, version, OTA, and auto-standby settings can be opened.
Cloud machineThe correct Micra is selected and machine status, boilers, or presets can load.

2. Shot-Dosing Acceptance

  1. Confirm C3 is powered and can connect to the Bluetooth scale.
  2. Read and adjust target yield from the remote shot-dosing page.
  3. Simulate target weight gently on the scale to confirm C3 can trigger stop.
  4. Pull a real shot and record target yield, stop-time curve value, and final settled cup weight.

3. Backflush and Maintenance Pages

During handover, also open the backflush page and confirm the 15-second paddle window, maintenance statistics, and state prompts. A shot curve must not appear by mistake during backflush, and a paddle-detection failure must not be misclassified as a normal extraction problem.

4. Records to Keep

5. Faster Support Follow-Up

If a later issue appears, open a support case from Order Lookup and include the order number, symptom, photos, or a short video. The handover record helps separate network, scale, C3, cloud-loading, and wiring problems.

View Device Store Back to User Guide Support